Here are the affected buildings:

List A
Saturday, March 10, 6 a.m.-Sunday, March 11, 6 p.m., these buildings will not have power:

Fairfax
Belknap Parking Garage
Natatorium
Steam/Chilled Water Plant
HPES
Ky Telco

List B
Saturday, March 10, 6 a.m.-7 a.m., and Sunday, March 11, 8 a.m.-9 a.m., these buildings will not have power:

Baptist Center
Brigman
Chemistry
Chemical Solvent Storage
Crawford Gym
Cultural Center
Davidson Hall
Dougherty
Duthie
Ekstrom
Ernst
Ford
49A Complex
49B Complex
49C Complex
Gardiner
Gottschalk
Grawemeyer
Honors Building
Houchens
Humanities
Interfaith Center
International Affairs (Brodschi)
IID
J.B. Speed
Jouett
Life Sciences
Louisville Hall
Lutz Hall
McCandless
Miller Hall
MITC
MITC Underground
Natural Sciences
North Information Center
Oppenheimer
Parkway Field
Planetarium
Patterson
Red Barn
Sackett
Schneider
College of Business
School of Education
School of Law
School of Music
Service Complex
Shumaker
Stevenson
Strickler
Student Health
Swain Student Activities Center
Threlkeld
Unitas
University Club
UTA
Vogt
West Information Center
W.S. Speed

Saturday, March 10, 7 a.m. to Sunday, March 11, 5 p.m., all buildings in list B will have power restored.

ONLY those buildings with stand-alone heating/cooling systems will have the ability to be heated or cooled, beyond the use of outside air. Air handlers in all buildings in list B will be operable during this time.

Existing generators that are connected to buildings will be in operation during this outage, if required.

Direct questions to Larry Detherage or Steve Michal.