
Effective Nov. 5 through Nov. 26 (weather permitting), the Belknap Academic Building’s contractor, Whittenberg Construction, has scheduled closure of specific sidewalk areas. There is construction fencing, signage and barricades that re-route pedestrian/vehicular pathways at the following areas:
- Sidewalk closed between Shumaker Research Building and new Belknap Academic Building
- Sod replacement in areas to the west of the building, in between Schneider/Lutz and Shumaker. The surrounding sidewalks to remain open with minimal encroachment.
A map of the affected areas is included at the following link:#UofL Construction Map_181029